Naked Steel         
The northernmost bays, #1 and #2, are now stripped of all ballast and debris to allow the ironworkers to cut the bridge apart and remove girders #1 and #2 (both visible, from left to right). The floor systems will also be removed.
Date: 8/2/2007 Location: Plainfield, NJ   Map Show Plainfield on a rail map Views: 271 Collection Of:   Dave Abeles
Author:  David Abeles
Naked Steel
Picture Categories: This picture is part of album:  So, you want to replace a railroad bridge...
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=831419