Westbound Track 2 Approach #1  Contributor's Pick!       
Westbound Track 2, signal Aspect; Steady Yellow/Amber over Steady Red. Name APPROACH, Indication Proceed prepared to stop at the next signal . Trains exceeding Medium Speed must begin reduction to Medium Speed as soon as the engine passes the Approach Signal. NORAC Rule 285. To the left of track 2 is the signal for the Port Reading Secondary where it connect to the Lehigh Line. To the right is track 1 westbound and its signal is displaying Red/Red Stop. Part of the Valley Interchange Track is visible behind Track 1. 70-300mm zoom lens used.
Date: 8/17/2022 Location: Bound Brook, NJ   Map Show Bound Brook on a rail map Views: 95 Collection Of:   Steve Coraggio
Author:  Steve Coraggio
Westbound Track 2  Approach #1
Picture Categories: Scenic,Bridge,Signal,Track,Action This picture is part of album:  MA-2 Westbound Track 2, with Approach then Stop and Proceed Signals then Continues West
Share
User Comments
Name Type Comments Date
Scott Crotwell General A very nice opening shot! 9/4/2022 7:17:48 AM
Steve Coraggio General Scott, thank you very much!!!!!!!!!!! 9/4/2022 9:19:37 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5828965