UP 8129 leads the first revenue train south over the new bridge at reduced spedd about 1 hour aftep the bridge was completed. |
Date:
2/8/2015 |
Location:
Galt, CA |
Views:
119 |
Collection Of:
Frederick S. Goethel |
Locomotives: |
Author: Frederick S. Goethel
|
|
Picture Categories: Roster,Bridge,Action |
This picture is part of album: Building a new bridge around an existing one |