RI 830         
After the Rock ceased operations on March 31, 1980, the RI trustees had this SW8 and an GP7 painted in Rock blue and white for "clean up" operations on the Southern Division.
Date: 1/29/1984 Location: Hodges, TX Views: 1233 Collection Of:   Ken Roble
Locomotives: CRIP 830(SW8)    Author:  Unknown
RI 830
Picture Categories: This picture is part of album:  Rock Island Railroad
Share
User Comments
Name Type Comments Date
Bill Pollard General At this date, RI 830 was en route from El Reno to Biddle, via the StLSW and Texas, because the Sunbelt line was severed at Howe, OK. #830 operated for almost 4 months in the Little Rock area before being shipped to Iowa City. 5/14/2015 9:15:23 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=36340