Six units drag the BKDOL through the former location of Tunnel 1/2. There will also be a six unit midtrain helper. This tunnel was daylighted and double track installed between Caliente and Ilmon during the rebuilding after the Spring 1983 flooding. SSW 9282 was later SP 9282, CEFX 9282. Date of photo approximate. |
Date:
1/1/1986 |
Location:
Caliente, CA Map ![Show Caliente on a rail map](/images/map_us.gif) |
Views:
365 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Mike Woodruff |
Locomotives: |
Author: Mike Woodruff
|
![SSW 9282](http://s3.amazonaws.com/rrpa_photos/9345/SSW9282-2.jpg) |
Picture Categories: |
This picture is part of album: Tehachapi Action |