Abutment Pour         
The contractor has poured the new top portion of the abutment and removed the formwork, revealing the look and texture of the new concrete 'stones' at New Street. This concrete will be architecturally stained to match the surrounding stones after all pours are complete. The remaining rebar will be used to reinforce the final pour for the backwall.
Date: 12/31/2007 Location: Plainfield, NJ   Map Show Plainfield on a rail map Views: 226 Collection Of:   Dave Abeles
Author:  David Abeles
Abutment Pour
Picture Categories: This picture is part of album:  So, you want to replace a railroad bridge...
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1002380